Cooma Solar Power Plant (CSPP)

Cooma Solar Project, is a 100MWe/110MWp integrated with a 40MWh energy storage under development in Choma District. The Cooma Solar plant is located near the ZESCO’s Muzuma substation in Chifwepa/Gamela area of Chief Cooma and is Zambia’s first grid-connected BESS integrated solar power plant.

Mukuni Solar

Mukuni Solar, is a 40MWe/48.2MWp integrated with a 10MWh energy storage under development in Livingstone District. The Mukuni Solar plant is located near the ZESCO’s Mukuni substation in area of Chief Mukuni.

Matta Green Hydrogen

Matta Power, a 100MW electrolysers green hydrogen under development in Kafue District. The Matta Power is the Zambia’s first large-scale green hydrogen intended for production of ammonia for nitrate fertiliser for farming and high-grade for mining blasting.

Water-Energy-Food Nexus

The Luapula Solar Farm Block (LSFB), a 1,500 hectares farmland in Luapula District. The LSFB, “Project”, is a groundbreaking initiative that seeks to unlock the full potential of Zambia’s farmland. Our innovative self-sufficient farm blocks is meticulously designed to enhance food production resilience, conserve resources, and empower smallholder farmers.

Mize Power

Mize Power, is a 60MWe/70MWp integrated with a 20MWh energy storage and 10MW mini-hydropower under development in Mwinilunga District. The Mize Power plant is located Chief Mumena’s chiefdom.

Butondo Power

Butondo Power, is a 180MWe/200MWp integrated with a 50MWh energy storage under development in Chililabombwe District.